Casale / Metafrax

2020

Production plant for the manufacture of melamine

Heating system with a capacity of 9’500 kW
and an operating temperature of 465°

Apaco has been contracted by a well-known global provider
of integrated solutions, Casale SA, for the production of
fertilizers and chemicals to supply the complete molten salt heating system for a new melamine plant with a
capacity of 40’000 MT/year at one of the leading
melamine producers in Russia.

Incyte

2020

Steam boiler system with 2 UL-S steam boilers

For a new biotechnological production at an innovative Swiss pharmaceutical company, a new steam boiler
heating system was required. The new steam boiler type
UL-S has a capacity of 5000 kg/h saturated steam. Through efficiency-enhancing additional modules, both energy costs and emissions are reduced.

CSL Behring

2018 – 2020

PROTINUS PROJECT

New construction of a biopharmaceutical production plant, prefabrication and installation of the hygienic piping and utility, 6 km of piping including the plant and installation planning (BIM), as well as GMP-compliant documentation and qualification. In future, drugs for the treatment of haemophilia will be produced at the Berne site.

CSL Behring

2018 – 2020

RCF Lengnau project

New construction of a biopharmaceutical production plant, first phase 1.1: Prefabrication and assembly of the hygienic piping and utility distribution system, 11 km of piping including GMP compliant documentation. In future, recombinant coagulation factors for the treatment of haemophilia will be produced at the Lengnau site.

ROCHE

2017 – 2019

PROJECT IVR CONSTRUCTION 098

New construction of a research centre, prefabrication and installation of the media supply, 19 km of piping including factory and installation planning (BIM), as well as GMP-compliant documentation and qualification

CABB Switzerland AG

2017 – 2018

BIOD project

Isometrics preparation, apparatus assembly, pipe prefabrication and assembly in stainless steel and special materials, Hastelloy C22, plastic PE-EL, PP, PPSEL and enamel, including documentation of materials and welding work.

BASF Switzerland AG

2016 – 2017

New construction of 5 reactors

Apparatus assembly, pipe prefabrication and assembly in stainless steel and special materials PTFE, Hastelloy plastic and enamel, including documentation of materials and welding work.

Biogen International GmbH

2016 – 2018

New construction of a biopharmaceutical production plant

Installation of the clean utility distribution system 16 km of pipelines including GMP compliant documentation of the welding work,
www.biogen-solothurn.ch/galerie. In future, drugs for the treatment of Alzheimer’s dementia will be produced at the Luterbach site.

F. Hoffmann La Roche AG

2015 – 2016

New construction of a refrigeration plant

Apparatus assembly, pipe prefabrication and assembly in stainless steel and steel, including documentation of materials and welding work.

Apaco AG