Sur cette page, nous avons répertorié une sélection de nos références dans les installations industrielles, et nous nous ferons un plaisir de répondre à vos questions. Nous serons heureux de vous fournir des références complémentaires sur demande.
2021
The heating capacity specified and required by the customer was 3 x 4’000 kW at a maximum permissible operating temperature of 330°C. For the complete HTM boiler house Apaco supplied 20 complete manufactured pump groups, each consisting of 2 pumps, in the range of DN50 up to DN200, several hundred control and shut-off valves, several measuring instruments as well as 2 expansion and storage tanks each.
APACO has been contracted by UC RUSAL Anode Plant LLC in Taishet, the worldwide second largest supplier of aluminium, to supply the complete equipment for the HTM boiler house including all required electrical switchboards (control and MCC) as well as all secondary loops and the appertaining tanks for the construction stage II of the plant. The contract included the design, specification, and delivery of all components for the HTM boiler house as well as all secondary pump groups and control valves with the respective FAT tests at the individual subcontractors, so that the individual components of the plant could be easily installed by a local construction company.
2020
Un système de chauffage d‘une capacité de 9 500 kW
et d‘une température de fonctionnement de 465°C
2017
Assemblage de préfabrication de tuyaux comprenant les documents de documentation et les travaux de soudage.
2016 – 2017
Préfabrication et assemblage de tuyaux, construction spéciale en acier inoxydable.
2016
Planification préfabrication et montage des conduites, coordination générale pour fonctionnement en 3 équipes.